Portable Seismic NetworkAugust 15, 2007 |
Google Earth Maps of Crandall Canyon and Locations of Portable Stations


Table1
Digital Instrumentation* with Onsite Recording |
|||||
| Station Name |
Location (WGS84datum)
|
Sensor | DAS S/N | ||
| Lat. N | Lon. W | Elevation (ft) | |||
| CM1 | 39° 27.99´ | 111° 14.08´ | 9,062 | Reftek 130 MEMs | 936b |
| CM2 | 39° 28.13´ | 111° 13.06´ | 10,553 | Reftek 130 MEMs | 936a |
* Portable REFTEK-130 DAS with External MEMs accelerometers
Table 2
Analog Telemetered Stations |
|||||||
| Station Name | Location (WGS84datum) |
Sensor | Seismometer Parameters | ||||
| Lat. N | Lon. W | Elevation (ft) | Rc | Rd | Gain | ||
| CM3 | 39° 26.78´ | 111° 12.86´ | 10,476 | Mark Products L-4 | 5500 | 4311 | 1600 |
| CM4 | 39° 30.53´ | 111° 15.68´ | 9,072 | Mark Products L-4 | 5463 | 7891 | 1600 |
| CM5 | 39° 28.04´ |
111° 8.90´ | 7,765 | Mark Products L-4 | 5495 | 4337 | 1600 |
* Rc- data coil resistance in ohms
Rd- damping resistance
Field Notes
August 10, 2007
Five stations were installed between Tuesday, Aug. 7 and Thursday, Aug. 9. The first two were stand-alone RefTek 130 digitizers with external MEMS accelerometers. The last three were our analog portable system with Mark Products L-4s and UUSS VCO. Telemetry for these three stations was brought on-line at 12:00 MDT Aug 10. For installation purposes we named the sites as CM1-5 (for Crandall Canyon Mine 1-5) with the number reflecting the order in which the site was installed. Detailed information for all stations is contained in the above tables. General comments follow:
CM1 - installed early evening 8/7/07. Soil site directly on top of UUSS original epicentral locations, a short distance west of the mine. The MEMS is buried in tightly packed soil beneath the electronics/battery enclosure. Solar panel mounted nearby. Site is very close to the helicopter staging area. Sensor is accurately oriented and leveled and channels 1-3 on the DAS reflect the Z, N, and E components of the sensor.
CM2 - installed ~ 12 noon 8/8/07 directly on top of the collapse area and a short distance east of the drilling area. The MEMS was bolted to bedrock. Recording system and battery in adjacent rubbermaid tub. Same sensor orientation and channel mapping as CM1.
CM3 - This site was installed late afternoon 8/8/07 with a single component L-4 one mile south of CM2. This is a soil site and is co-located with a radio telemetry relay.
CM4 - Installed morning of 8/9/07. Single component L-4. This is a soil site located approximately 5 miles NW of mine for azimuthal control.
CM5 - Installed late afternoon 8/9/07. Single component L-4. This is a bedrock site approximately 5 miles east of collapse for azimuthal control.
Data were downloaded from the RT130 sites mid-day on Thursday Aug 9.